MANDARIN HOTEL

Client:

Mandarin Oriental Hotel Group

Value:

£0.7m

Role:

Project Management,
Cost Management

Refurbishment of the Ballroom, Carlyle Room, Loggia, Foyer, Cloakroom and Entrance to the Mandarin Oriental Hyde Park including repairs and replacement of decorative plaster and timber mouldings, gilding and redecoration generally, new carpets, curtains, electrical power and lighting. Formation of two arched openings in structural walls, including steel support frames, decorative plaster mouldings, ceiling repairs, removal of redundant radiators including asbestos removal. Creation of a new Dispense Bar in the Foyer with stainless steel fittings and electrically operated roller shutters, renewal of the main stair and balcony handrail and balustrading, repairs to marble columns and stairs. The works were carried out in the 6 weeks between the New Years Eve and St Valentine’s Day pre-booked events.

Related Projects

BLOC HOTEL, GATWICK

THE LANSDOWNE CLUB

PREMIER INN

H10 HOTEL, WATERLOO, LONDON